December 2007 Jobs

December 2007

Here are some projects that were completed during the month of December.  You can see some of the work that we are completing nationwide.  Some jobs are completed during our standard service levels and some jobs are either Urgent or Critical.  Winter does not slow us down for the most part.  Where it is critical to get a wheelchair ramp up in winter time, our modular ramp can be installed in hours.  In many cases when attempting to construct a wooden ramp, the ground is already frozen and does not allow you to dig for footings.  Clearly we have the advantage over wood.

Ramp with Skirting

This paticular job required the installation of our modular ramp on a mobile home that was located in a mobile home park with restrictions.  The restrictions required skirting to match the mobile home and be attached to the ramp.  As the photos show we were able to complete the required task with a quality look to the entire system

Before Skirting After Skirting 2 After Skirting 1

Winter Challenges

With winter comes many challenges.  Challenges are what strengthens our business.  As we overcome them we continue to build our reputation as the company that is able to get the job done.  Here are a few jobs with a winter theme.  Merry Christmas.

Winter 7 Winter 6 Winter 4 Winter 3 Winter 2 Winter 1

Site Unseen

This job was a site unseen job.  We were able to estimate the amount of ramp needed and configure what we thought would work.  Once on site we had to make a complete 180 degree change in the layout, but because our system is modular and easy to assemble we were able to complete the job.

Winter 5 Winer 10 Winer 8