School Project

This recent project used all our options. 

The school chose to use the "over 30" design which included the 4" on center picket railing.  

Because of space issues we used a "switchback" landing to turn the ramp run 180 degrees back onto the sidewalk in front of the building.  They also chose to use a set of steps for the ease of regular foot traffic.

Lanikai 10 Lanikai 8 1 Lanikai 6 1 Lanikai 5 1 Lanikai 4 1 Lanikai 1 1 Lanikai 1